News for 'National Highways and Infrastructure Development Corporation'

Badrinath highway shows fresh signs of subsidence

Badrinath highway shows fresh signs of subsidence

Rediff.com19 Aug 2023

A stretch about 50 metres long on the Rishikesh-Badrinath National Highway near Pursari village is showing signs of land subsidence with cracks appearing on it.

Realty's Next Address: SPR, Sohna Power NCR's Growth

Realty's Next Address: SPR, Sohna Power NCR's Growth

Rediff.com18 Oct 2025

Part-I of this three-part series dives into Delhi-NCR's SPR, Sohna, Dwarka Expressway, and Jewar Airport leading the charge.

Gadkari keen to fast-track highway projects

Gadkari keen to fast-track highway projects

Rediff.com23 Jan 2020

Various stakeholders, including about 600 developers, bankers and officials from various wings, including the National Highways Authority of India, will also be present.

Terror Attacks No Cause Of Alarm For J&K Projects

Terror Attacks No Cause Of Alarm For J&K Projects

Rediff.com29 Oct 2024

'If you are in a position to give employment to local people, you will find no terror attacks in your area.'

Tunnel projects in Uttarakhand to be reviewed: CM Dhami

Tunnel projects in Uttarakhand to be reviewed: CM Dhami

Rediff.com16 Nov 2023

All tunnels being constructed in Uttarakhand will be reviewed, Chief Minister Pushkar Singh Dhami said on Thursday after drilling began at the Silkyara tunnel with a heavy duty machine to rescue 40 labourers trapped there for four days.

The India Story: 90% Work In Progress

The India Story: 90% Work In Progress

Rediff.com2 Jan 2025

From highways connecting once-remote regions to aviation networks carrying millions, India's infrastructure story is one of transformation.

Uttarkashi tunnel collapse: Rescuers to drill through rubble

Uttarkashi tunnel collapse: Rescuers to drill through rubble

Rediff.com14 Nov 2023

Rescuers at the under-construction tunnel collapse site in Uttarkashi on Tuesday initiated the process of inserting large-diameter mild steel pipes through the rubble using an auger machine to rescue the 40 workers trapped for two days now, officials said.

Govt gets Rs 6,651 cr interim dividend from 12 PSUs

Govt gets Rs 6,651 cr interim dividend from 12 PSUs

Rediff.com19 Jan 2022

The Centre has received Rs 6,651 crore as interim dividend from 12 public sector undertakings (PSUs) on Monday, edging towards its Rs 50,028 crore dividend target for the ongoing fiscal. Power Grid Corporation of India (PGCIL) has transferred Rs 2,506 crore as a dividend tranche to the government, while NMDC and Nuclear Power Corporation of India transferred interim dividend of Rs 1,605 crore and Rs 972 crore, respectively. The government has received dividend tranches of Rs 913 crore from GAIL, Rs 351 crore from Hindustan Aeronautics, Rs 149 crore from Bharat Electronics, among others, Department of Investment and Public Asset Management (DIPAM) secretary Tuhin Kanta Pandey tweeted.

Yogi holds cabinet meet at Maha Kumbh, takes holy dip at Sangam

Yogi holds cabinet meet at Maha Kumbh, takes holy dip at Sangam

Rediff.com22 Jan 2025

The Cabinet meeting and the holy dip comes on a day that marks the first anniversary of the consecration ceremony of the Ram temple in Ayodhya.

NGO files PIL on Silkyara tunnel rescue, HC seeks govt reply in 48 hrs

NGO files PIL on Silkyara tunnel rescue, HC seeks govt reply in 48 hrs

Rediff.com20 Nov 2023

The Uttarakhand high court on Monday sought replies from the state government and central agencies within 48 hours on the ongoing operation and measures taken to rescue 41 workers trapped inside a partially collapsed tunnel in Uttarkashi for more than a week.

Emission Norms Battle Hots Up: M&M Counters Maruti Suzuki

Emission Norms Battle Hots Up: M&M Counters Maruti Suzuki

Rediff.com21 Jul 2025

The growing rift between MSIL and rival automakers has complicated the government's efforts to finalise the CAFE norms.

After 5 days, slow progress in tunnel rescue as drill takes longer

After 5 days, slow progress in tunnel rescue as drill takes longer

Rediff.com18 Nov 2023

The labourers have been trapped since Sunday morning when a part of the tunnel collapsed following a landslide.

U'khand tunnel collapse: Oxygen being supplied, efforts on to rescue workers

U'khand tunnel collapse: Oxygen being supplied, efforts on to rescue workers

Rediff.com12 Nov 2023

They said the incident occurred around 4 am when a 150-metre-long portion of the four-and-a-half-kilometer-long tunnel collapsed.

L&T to construct India's longest river bridge

L&T to construct India's longest river bridge

Rediff.com25 Nov 2020

Larsen & Toubro (L&T) on Wednesday said it has secured a large contract to construct the country's longest road bridge across river Brahmaputra connecting Dhubri in Assam to Phulbari in Meghalaya. The contract was bagged by the company's subsidiary L&T Construction. As per the company, a large contract is worth Rs 2,500-5,000 crore.

In Pics: Glimpses of Z-Morh and Zojila tunnels

In Pics: Glimpses of Z-Morh and Zojila tunnels

Rediff.com29 Sep 2021

While the 6.5-km the Z-Morh tunnel is expected to be completed by next year, ahead of the target date of December 2023, the 14.15 km Zojila tunnel is also scheduled to be completed ahead of the target date of 2026, National Highways and Infrastructure Development Corporation Limited officials said.

Vertical drilling in Silkyara tunnel likely to be completed by Nov 30: NHIDCL

Vertical drilling in Silkyara tunnel likely to be completed by Nov 30: NHIDCL

Rediff.com27 Nov 2023

Micro tunnelling expert Chris Cooper said on Monday that all the debris from the auger machine has been removed and manual drilling to reach the trapped labourers will start in a few hours.

It may take less than 3 days to rescue trapped tunnel workers if ...: Official

It may take less than 3 days to rescue trapped tunnel workers if ...: Official

Rediff.com21 Nov 2023

He further said that the "focus is on horizontal drilling" as rock formation has created challenges for vertical drilling.

Jharkhand govt forms panel to probe ropeway accident

Jharkhand govt forms panel to probe ropeway accident

Rediff.com20 Apr 2022

The committee will submit its report in two months and its chairperson can invite any expert of any institution in the country to help in the probe into the April 10 tragedy, a notification by Jharkhand tourism department said.

Investors queue up to rescue highway projects

Investors queue up to rescue highway projects

Rediff.com21 Jul 2016

Govt to chalk out entry of sovereign funds from Abu Dhabi, Qatar into such projects.

Hot khichdi sent to trapped tunnel workers

Hot khichdi sent to trapped tunnel workers

Rediff.com21 Nov 2023

Through this 6-inch alternative lifeline, hot khichdi was sent to the stranded workers for the first time since they were trapped.

Govt plans to build Zojila-like tunnel to Ladakh

Govt plans to build Zojila-like tunnel to Ladakh

Rediff.com14 Sep 2020

The tunnel would reduce the travel time to the Ladakh region by 15-20 per cent and would come up close to the Atal tunnel near Rohtang Pass, reports Megha Manchanda.

Day 7 of tunnel rescue: Vertical drilling to begin soon

Day 7 of tunnel rescue: Vertical drilling to begin soon

Rediff.com19 Nov 2023

Larger diameter pipes have also been inserted up to a length of 42 metres through the debris on Sunday morning to provide enough food and other essentials to the trapped workers, a control room set up at the site said.

Bureaucratic reshuffle: Rajiv Gauba replaces Mehrishi as Home Secy

Bureaucratic reshuffle: Rajiv Gauba replaces Mehrishi as Home Secy

Rediff.com21 Jun 2017

A total of 16 secretaries have been appointed to various central government departments.

Uttarkashi: Fresh attempt to rescue workers trapped in tunnel for 5 days

Uttarkashi: Fresh attempt to rescue workers trapped in tunnel for 5 days

Rediff.com16 Nov 2023

A heavy-duty drilling machine flown in by the Indian Air Force (IAF) from Delhi began boring through the rubble of a collapsed tunnel on the Char Dham route in Uttarakhand Thursday, in a fresh attempt to create an escape passage for 40 workers trapped inside for four days.

Four in race for Rs 10,000-cr tunnel in Kashmir

Four in race for Rs 10,000-cr tunnel in Kashmir

Rediff.com2 Jun 2017

The tunnel would provide all-weather connectivity between Srinagar and Leh-Ladakh

CPSE assets sale to bring about paradigm shift in infrastructure: FM

CPSE assets sale to bring about paradigm shift in infrastructure: FM

Rediff.com9 Mar 2021

Finance Minister Nirmala Sitharaman on Tuesday said monetisation of Central Public Sector Enterprises (CPSE) assets is based on the principle of value creation for the government and investors and would bring about a paradigm shift in infrastructure augmentation and maintenance. Chairing the National Workshop with the states/UTs on Asset Monetisation organised by Niti Aayog, the minister sought the collaboration of states for the holistic development of infrastructure. She said India can become a $5 trillion economy, while striking the right balance between fiscal imperatives and socio-economic welfare, through active collaboration between the public and private sector.

'Tunnel rescue like war, can't speculate when it will end'

'Tunnel rescue like war, can't speculate when it will end'

Rediff.com23 Nov 2023

The 41 workers trapped in Uttarakhand's Silkyara tunnel for the last 11 days are likely to be rescued in the next few hours or by tomorrow, National Disaster Management Authority (NDMA) member Lt Gen (retd) Syed Ata Hasnain said on Thursday evening.

Modi inaugurates projects worth Rs 7,600cr in poll-bound Chhattisgarh

Modi inaugurates projects worth Rs 7,600cr in poll-bound Chhattisgarh

Rediff.com7 Jul 2023

Modi also virtually flagged off a new train between Antagarh in Kanker district and Raipur and kickstarted the distribution of cards of the Centre's Ayushman Bharat scheme to beneficiaries in the state.

Uttarakhand tunnel rescue: The progress so far

Uttarakhand tunnel rescue: The progress so far

Rediff.com19 Nov 2023

It has been a week since 41 labourers got trapped inside an under-construction tunnel at Silkyara in Uttarakhand's Uttarkashi district after parts of the structure collapsed following a landslide last Sunday.

Uttarakhand tunnel rescue: New drill machine works, raises hopes

Uttarakhand tunnel rescue: New drill machine works, raises hopes

Rediff.com16 Nov 2023

Officials said in the evening that a six-metre section of a steel pipe had been inserted into the bored passage. Another section was being welded into it. The plan is to insert 800 mm and 900 mm diameter pipes -- one after the other -- with the help of the giant drill till an escape passage is created for the workers stranded beyond the collapsed portion of the under-construction tunnel.

Himachal Kinnaur cut off from Shimla after major landslide

Himachal Kinnaur cut off from Shimla after major landslide

Rediff.com8 Sep 2023

Machinery and manpower have been deployed, but stones falling from the hills are obstructing the road opening work, the officials said.

All rescued workers are normal, can return home: AIIMS-Rishikesh

All rescued workers are normal, can return home: AIIMS-Rishikesh

Rediff.com30 Nov 2023

Dr Ravikant said the workers were thoroughly examined and their blood test, X-ray, and ECG reports were normal.

6 infra PSUs to issue tax-exempt bonds

6 infra PSUs to issue tax-exempt bonds

Rediff.com27 Jun 2011

IRFC, NHAI, Hudco and others to hit the market in next few months.

Workers trapped in tunnel for a week now, families anxious

Workers trapped in tunnel for a week now, families anxious

Rediff.com18 Nov 2023

'India has gone digital. They talk about the success of India's Chandrayaan mission but they cannot evacuate our people trapped for around a week'

Uttarkashi tunnel rescue op on hold after machine snag

Uttarkashi tunnel rescue op on hold after machine snag

Rediff.com18 Nov 2023

The round-the-clock rescue work is being carried out by 165 personnel from multiple agencies, including the National Disaster Response Force, State Disaster Response Force, Border Roads Organisation and the Indo-Tibetan Border Police, the State Emergency Operation Centre said.

Zojila Tunnel: All you need to know about India's longest road tunnel

Zojila Tunnel: All you need to know about India's longest road tunnel

Rediff.com2 Feb 2018

The 14.15 km tunnel will provide all-weather connectivity to Srinagar, Kargil and Leh.

Gadkari plans to meet infra target despite lockdown

Gadkari plans to meet infra target despite lockdown

Rediff.com22 Apr 2020

'Despite the pandemic, we aspire to maintain the momentum of last year.'

Large projects underway to boost border infra: Gadkari

Large projects underway to boost border infra: Gadkari

Rediff.com5 Jul 2020

Work is also progressing on 17 strategic highway-cum-airstrips, three of which have been completed, he said. Besides, work is on in full swing on the Rs 12,000 crore ambitious Chardham project for providing all-weather connectivity to Gangotri, Kedarnath, Yamunotri and Badrinath.

Tunnel rescue: Vertical boring underway, here's what happens now

Tunnel rescue: Vertical boring underway, here's what happens now

Rediff.com26 Nov 2023

The vertical approach was one of the at least five options on which preparatory work had begun some days back, as anxiety mounted over the fate of the men trapped in the under-construction tunnel on Uttarakhand's Char Dham route.

6-inch lifeline pipe reaches trapped men in Silkyara, to send food and oxygen

6-inch lifeline pipe reaches trapped men in Silkyara, to send food and oxygen

Rediff.com20 Nov 2023

A six-inch pipe has been laid at the Silkyara tunnel through which nutritious food and medicines could be supplied to the 41 labourers, trapped for over a week after parts of the under-construction structure collapsed following a landslide.